• Skip to main content
  • Skip to secondary menu
  • Skip to footer

Technologies.org

Technology Trends: Follow the Money

  • Technology Events 2026-2027
  • Sponsored Post
  • Technology Markets
  • About
    • GDPR
  • Contact

NASA Announces Landing Site for Mars 2020 Rover

November 19, 2018 By admin Leave a Comment

NASA has chosen Jezero Crater as the landing site for its upcoming Mars 2020 rover mission after a five year search, during which every available detail of more than 60 candidate locations on the Red Planet was scrutinized and debated by the mission team and the planetary science community.

The rover mission is scheduled to launch in July 2020 as NASA’s next step in exploration of the Red Planet. It will not only seek signs of ancient habitable conditions – and past microbial life — but the rover also will collect rock and soil samples and store them in a cache on the planet’s surface. NASA and ESA (European Space Agency) are studying future mission concepts to retrieve the samples and return them to Earth, so this landing site sets the stage for the next decade of Mars exploration.

“The landing site in Jezero Crater offers geologically rich terrain, with landforms reaching as far back as 3.6 billion years old, that could potentially answer important questions in planetary evolution and astrobiology,” said Thomas Zurbuchen, associate administrator for NASA’s Science Mission Directorate. “Getting samples from this unique area will revolutionize how we think about Mars and its ability to harbor life.”

Jezero Crater is located on the western edge of Isidis Planitia, a giant impact basin just north of the Martian equator. Western Isidis presents some of the oldest and most scientifically interesting landscapes Mars has to offer. Mission scientists believe the 28-mile-wide (45-kilometer) crater, once home to an ancient river delta, could have collected and preserved ancient organic molecules and other potential signs of microbial life from the water and sediments that flowed into the crater billions of years ago.

Jezero Crater’s ancient lake-delta system offers many promising sampling targets of at least five different kinds of rock, including clays and carbonates that have high potential to preserve signatures of past life. In addition, the material carried into the delta from a large watershed may contain a wide variety of minerals from inside and outside the crater.

The geologic diversity that makes Jezero so appealing to Mars 2020 scientists also makes it a challenge for the team’s entry, descent and landing (EDL) engineers. Along with the massive nearby river delta and small crater impacts, the site contains numerous boulders and rocks to the east, cliffs to the west, and depressions filled with aeolian bedforms (wind-derived ripples in sand that could trap a rover) in several locations.

“The Mars community has long coveted the scientific value of sites such as Jezero Crater, and a previous mission contemplated going there, but the challenges with safely landing were considered prohibitive,” said Ken Farley, project scientist for Mars 2020 at NASA’s Jet Propulsion Laboratory. “But what was once out of reach is now conceivable, thanks to the 2020 engineering team and advances in Mars entry, descent and landing technologies.”

When the landing site search began, mission engineers already had refined the landing system such that they were able to reduce the Mars 2020 landing zone to an area 50 percent smaller than that for the landing of NASA’s Curiosity rover at Gale Crater in 2012. This allowed the science community to consider more challenging landing sites. The sites of greatest scientific interest led NASA to add a new capability called Terrain Relative Navigation (TRN). TRN will enable the “sky crane” descent stage, the rocket-powered system that carries the rover down to the surface, to avoid hazardous areas.

The site selection is dependent upon extensive analyses and verification testing of the TRN capability. A final report will be presented to an independent review board and NASA Headquarters in the fall of 2019.

“Nothing has been more difficult in robotic planetary exploration than landing on Mars,” said Zurbuchen. “The Mars 2020 engineering team has done a tremendous amount of work to prepare us for this decision. The team will continue their work to truly understand the TRN system and the risks involved, and we will review the findings independently to reassure we have maximized our chances for success.”

Selecting a landing site this early allows the rover drivers and science operations team to optimize their plans for exploring Jezero Crater once the rover is safely on the ground. Using data from NASA’s fleet of Mars orbiters, they will map the terrain in greater detail and identify regions of interest – places with the most interesting geological features, for example – where Mars 2020 could collect the best science samples.

The Mars 2020 Project at JPL manages rover development for SMD. NASA’s Launch Services Program, based at the agency’s Kennedy Space Center in Florida, is responsible for launch management. Mars 2020 will launch from Cape Canaveral Air Force Station in Florida.

For more information on Mars 2020, visit:

https://www.nasa.gov/mars2020

More information about NASA’s exploration of Mars is available online at:

https://www.nasa.gov/mars

SOURCE NASA

Related Links
http://www.nasa.gov

Filed Under: Tech

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Footer

Recent Posts

  • Dify Raises $30 Million to Power the Next Wave of Production AI Applications
  • Nscale’s $2 Billion Bet on the Physical Backbone of the AI Economy
  • Why USB-C Charging on the MacBook Neo Raises Questions About Port Durability
  • MagSafe Wireless Charging: The Magnetic Reinvention of Power
  • Apple Unveils MacBook Neo: A $599 Entry Into the Mac Ecosystem
  • Apple Unveils M5 Pro and M5 Max: A New Era for MacBook Pro, MacBook Air, and Studio Display
  • Apple iPhone 17e: Performance, Practicality, and a Smarter Entry Point into the iPhone 17 Family
  • Apple iPad Air M4 Arrives With 12GB Memory, Wi-Fi 7, and a Serious AI Push
  • Ericsson and Intel Are Redefining What 6G Is Actually For
  • Hollow-Core Fibre, Light Running Through Air Instead of Glass

Media Partners

  • Market Analysis
  • Cybersecurity Market
Beyond Shipyards: Stephen Carmel’s Maritime Warning and the Hard Reality of Rebuilding an Oceanic System
Memory Crunch: Why Prices Are Surging and Why Making More Memory Isn’t Easy
The End of Accounting as We Knew It
The Era of Superhuman Logistics Has Arrived: Building the First Autonomous Freight Network
Why Nvidia Shares Jumped on Meta, and Why the Market Cared
Accrual Launches With $75M to Push AI-Native Automation Into Core Accounting Workflows
Europe’s Digital Sovereignty Moment, or How Regulation Became a Competitive Handicap
Palantir Q4 2025: From Earnings Beat to Model Re-Rating
Baseten Raises $300M to Dominate the Inference Layer of AI, Valued at $5B
Nvidia’s China Problem Is Self-Inflicted, and Washington Should Stop Pretending Otherwise
Armadin Raises $189.9 Million to Build an AI Attacker That Defends the Enterprise
Day Zero Threat Research Summit, August 30 – September 1, 2026, Las Vegas
CrowdStrike Returns to Profit as Revenue Climbs to $1.31 Billion in Q4
Cloudflare 2026 Threat Report Signals the Automation of Cyberwar
Fal.Con Gov 2026, March 18, Washington, D.C.
Huper Corporation Raises $1.5M Pre-Seed to Build a Security-First AI Chief of Staff
CyberBay Summit 2026, March 11–13, Tampa, Florida
Zscaler’s Q2 Beat and the Market’s Reluctance to Celebrate
AI as the New Insider: Why Trust, Not Code, Is Now the Weakest Link
Cybersecurity Meets Corporate Travel: Darktrace Chooses AI-Driven Navan to Power Global Mobility

Media Partners

  • Market Research Media
  • Technology Conferences
The Rise of Faceless Creators: Picsart Launches Persona and Storyline for AI Character-Driven Content
Apple TV Arrives on The Roku Channel, Expanding the Streaming Platform Wars
Why Attraction-Grabbing Stations Win at Tech Events
Why Nvidia Let Go of Arm, and Why It Matters Now
When the Market Wants a Story, Not Numbers: Rethinking AMD’s Q4 Selloff
BBC and the Gaza War: How Disproportionate Attention Reshapes Reality
Parallel Museums: Why the Future of Art Might Be Copies, Not Originals
ClickHouse Series D, The $400M Bet That Data Infrastructure, Not Models, Will Decide the AI Era
AI Productivity Paradox: When Speed Eats Its Own Gain
Voice AI as Infrastructure: How Deepgram Signals a New Media Market Segment
COMPUTEX 2026, June 2–5, Taipei
360° Mobility Mega Shows 2026, April 14–17, Taipei
Forrester CX Summit Series 2026: Amsterdam, New York, San Francisco
IAMPHENOM 2026, March 10–12, Pennsylvania Convention Center, Philadelphia
Billington State and Local CyberSecurity Summit, March 9–11, 2026, Washington, D.C.
Mobile World Congress (MWC) 2026 – 2–5 March, Barcelona, Spain
The AI Summit London, 10–11 June 2026, Tobacco Dock, London
aim10x Digital 2026, March 18, Virtual
Harvard Business Review Strategy Summit, February 26, 2026, Virtual
International Compact Modeling Conference, July 30–31, 2026, Long Beach, California

Copyright © 2022 Technologies.org

Media Partners: Market Analysis & Market Research and Exclusive Domains, Photography