• Skip to main content
  • Skip to secondary menu
  • Skip to footer

Technologies.org

Technology Trends: Follow the Money

  • Technology Events 2026-2027
  • Sponsored Post
  • Technology Markets
  • About
    • GDPR
  • Contact

Total to Develop Qatar’s First Large-Scale (800 MWp) Solar Plant

January 20, 2020 By admin Leave a Comment

Total (Paris:FP) (LSE:TTA) (NYSE:TOT) has entered into agreements for the development of the Al Kharsaah Solar PV IPP Project, a 800 megawatt-peak (MWp) solar plant that will be located 80 kilometers west of Doha, Qatar. The project was awarded to a consortium of Total (49%) and Marubeni (51%) as the result of the country’s first solar tender.

“We are proud to pioneer the development of the first large-scale solar power plant in Qatar and support the country’s assertive commitment to developing renewable energy. Together with our partners, we will bring the best of our expertise and technical know-how to deliver one of the most competitive projects in the world”, said Patrick Pouyanné, Chairman and CEO of Total. “Al Kharsaah, Total’s largest solar project to date, will contribute to our ambition to deploy 25 GW of renewables by 2025. This project further strengthens our long-term partnership with Qatar in oil, natural gas, refining and petrochemicals and expands it to include renewable energy. It is a very clear symbol of the strategy of Total to become a global energy company.”

Qatar’s first large-scale solar power plant, Al Kharsaah will provide sustainable, affordable and clean energy to industries, services and individuals through the Qatari grid starting from 2021 with an initial 350 MWp capacity before reaching its full capacity in 2022. It will represent around 10% of electricity peak demand of the country and will reduce the CO2 emissions of Qatar by 26 million tons during the life of the project. The solar plant will be built on over 1000 hectares of land and equipped with 2 million bifacial solar modules with trackers, allowing substantial power gains and leveraging the advantage of the exceptional sunlight exposure in the region. It will represent an investment of around 500 million US dollars.

The project will be developed and operated by Siraj 1 SPV, jointly owned by the Consortium of Total Solar International and Marubeni (40%), alongside Siraj Energy (60%), a Joint Venture between Qatar Petroleum (40%) and QEWC (Qatar Electricity & Water Company, 60%).The project benefits from a 25-year power purchase agreement (PPA) to supply electricity to the offtaker Kahramaa.

Total and Low-Carbon Electricity

Total integrates climate change into its strategy and is staying ahead of new energy market trends by building a portfolio of low-carbon businesses that could account for 15 to 20% of its sales by 2040. Total’s gross low-carbon power generation capacity worldwide is currently close to 7 gigawatts, of which over 3 gigawatts from renewable energies.

Total actively contributes to the growth of solar energy worldwide by designing and operating utility-scale power plants and supplying industrial and commercial customers with solar energy generated at their sites.

About Total in Qatar
Present in Qatar since 1936, Total holds along with its partner Qatar Petroleum a 20% interest in the upstream part of Qatargas 1, a 10% interest in the Qatargas 1 liquefaction plant joint venture, a 16.7% stake in the Qatargas 2 train 5 joint venture, a 40% interest in Al-Khalij offshore oil field and a 30% stake in North Oil Company joint venture which operates the giant Al-Shaheen offshore oil field. Total also holds a 24.5% stake in the Dolphin Energy Ltd Company. Total’s production in the country averaged 211,000 barrels of oil equivalent per day in 2018.

Total is also a partner in the Ras Laffan Refineries with a 10% interest and in the Qapco (20%), RLOC (22.4%) and Qatofin (48.6%) petrochemical plants.

Filed Under: Tech Tagged With: Al Kharsaah Solar PV IPP Project, Qatar, Qatar’s First Large-Scale (800 MWp) Solar Plant, Solar Plant, Total

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Footer

Recent Posts

  • Apple iPhone 17e: Performance, Practicality, and a Smarter Entry Point into the iPhone 17 Family
  • Apple iPad Air M4 Arrives With 12GB Memory, Wi-Fi 7, and a Serious AI Push
  • Ericsson and Intel Are Redefining What 6G Is Actually For
  • Hollow-Core Fibre, Light Running Through Air Instead of Glass
  • Revel Raises $150M to Modernize the Software Backbone of Mission-Critical Hardware
  • Samsung Galaxy S26 Series: Polished, Predictable, and Playing It Safe
  • SambaNova Unveils SN50 AI Chip, Secures $350M+ Funding, and Strikes Strategic Intel Partnership
  • Aalyria Raises $100M Series B to Build the Control Plane for the Space Internet
  • Faraday Future’s Quiet Reset: Robots First, Cars Follow, Cash Matters Now
  • Pepper Raises $50 Million Series C to Modernize Independent Food Distribution

Media Partners

  • Market Analysis
  • Cybersecurity Market
Memory Crunch: Why Prices Are Surging and Why Making More Memory Isn’t Easy
The End of Accounting as We Knew It
The Era of Superhuman Logistics Has Arrived: Building the First Autonomous Freight Network
Why Nvidia Shares Jumped on Meta, and Why the Market Cared
Accrual Launches With $75M to Push AI-Native Automation Into Core Accounting Workflows
Europe’s Digital Sovereignty Moment, or How Regulation Became a Competitive Handicap
Palantir Q4 2025: From Earnings Beat to Model Re-Rating
Baseten Raises $300M to Dominate the Inference Layer of AI, Valued at $5B
Nvidia’s China Problem Is Self-Inflicted, and Washington Should Stop Pretending Otherwise
USPS and the Theater of Control: How Government Freezes Failure in Place
Fal.Con Gov 2026, March 18, Washington, D.C.
Huper Corporation Raises $1.5M Pre-Seed to Build a Security-First AI Chief of Staff
CyberBay Summit 2026, March 11–13, Tampa, Florida
Zscaler’s Q2 Beat and the Market’s Reluctance to Celebrate
AI as the New Insider: Why Trust, Not Code, Is Now the Weakest Link
Cybersecurity Meets Corporate Travel: Darktrace Chooses AI-Driven Navan to Power Global Mobility
Black Hat Asia 2026, April 21–24, Singapore
Billington State and Local CyberSecurity Summit, March 9–11, 2026, Washington, D.C.
The Future of Incident Management: A Blueprint for Operational Excellence, March 17, 2026, London
Gartner Identity & Access Management Summit, 9 – 10 March 2026, London, U.K.

Media Partners

  • Market Research Media
  • Technology Conferences
Why Attraction-Grabbing Stations Win at Tech Events
Why Nvidia Let Go of Arm, and Why It Matters Now
When the Market Wants a Story, Not Numbers: Rethinking AMD’s Q4 Selloff
BBC and the Gaza War: How Disproportionate Attention Reshapes Reality
Parallel Museums: Why the Future of Art Might Be Copies, Not Originals
ClickHouse Series D, The $400M Bet That Data Infrastructure, Not Models, Will Decide the AI Era
AI Productivity Paradox: When Speed Eats Its Own Gain
Voice AI as Infrastructure: How Deepgram Signals a New Media Market Segment
Spangle AI and the Agentic Commerce Stack: When Discovery and Conversion Converge Into One Layer
PlayStation and the Quiet Power Center of a $200 Billion Gaming Industry
Mobile World Congress (MWC) 2026 – 2–5 March, Barcelona, Spain
The AI Summit London, 10–11 June 2026, Tobacco Dock, London
aim10x Digital 2026, March 18, Virtual
Harvard Business Review Strategy Summit, February 26, 2026, Virtual
International Compact Modeling Conference, July 30–31, 2026, Long Beach, California
Israel Tech Week Miami (ISRTW), April 27–30, 2026, Miami, Florida
Data Centre World London, 4–5 March 2026, ExCeL London
Hannover Messe: Trade Fair for the Manufacturing Industry, 20–24 April 2026, Hannover, Germany
DesignCon 2026, Feb. 24–26, Santa Clara Convention Center
NICT at Mobile World Congress 2026, March 2–5, Barcelona

Copyright © 2022 Technologies.org

Media Partners: Market Analysis & Market Research and Exclusive Domains, Photography