• Skip to main content
  • Skip to secondary menu
  • Skip to footer

Technologies.org

Technology Trends: Follow the Money

  • Technology Events 2026-2027
  • Sponsored Post
  • Technology Markets
  • About
    • GDPR
  • Contact

NuScale Power places first long lead material production order for the manufacture of SMR

March 10, 2023 By admin Leave a Comment

NuScale Power Corporation has placed the first upper reactor pressure vessel long lead material production order with Doosan Enerbility. The order includes essential materials for the manufacture of the first NuScale Power Modules, which are expected to be in commercial operation at the Utah Associated Municipal Power Systems’ Carbon Free Power Project by 2029. The order is a significant step towards the commercialization of NuScale’s small modular reactor technology. NuScale and Doosan are also aligned to manufacture additional modules for future NuScale VOYGR SMR power plant projects with similar delivery dates. The order includes heavy forgings, steam generator tubes, and weld material for six upper RPVs, with an estimated weight of over 2,000 tons.

Filed Under: News Tagged With: NuScale Power places first long lead material production order with Doosan Enerbility for small modular reactor technology, SMR, small modular reactor

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Footer

Recent Posts

  • Manna’s Second Act: From Drone Novelty to Logistics Infrastructure
  • Britain Advances SMR Deployment with £300M Owner’s Engineer Contract
  • OpenAI Closes $122B Funding Round at $852B Valuation
  • Qodo’s $70M Series B Shows Where Enterprise AI Coding Is Really Headed
  • Agentic Compliance: When Governance Finally Catches Up With AI
  • IQM’s BlackRock-Backed Financing Signals a More Serious European Quantum Push
  • Starcloud Raises $170M to Build Data Centers in Space
  • Sycamore Raises $65M to Build the Operating System for Autonomous Enterprise AI
  • The Open Bridge: Why Vector Databases Need the Model Context Protocol
  • Mitsubishi Electric Bets on Sakana AI to Turn Industrial Complexity into Competitive Advantage

Media Partners

  • Market Analysis
  • Cybersecurity Market
Nvidia’s Groq 3 LPX: The $20B Bet That Could Define the Inference Era
Why Arm’s New AI Chip Changes the Rules of the Game
A Map Without Hormuz: Rewiring Global Oil Flows Through Fragmented Corridors
RoboForce’s $52 Million Raise Signals That Physical AI Is Moving From Demo Stage to Industrial Scale
The Hormuz Crisis: Winners and Losers in the Global Energy Shock
Zohran Mamdani’s Politics of Confiscation
Beyond Shipyards: Stephen Carmel’s Maritime Warning and the Hard Reality of Rebuilding an Oceanic System
Memory Crunch: Why Prices Are Surging and Why Making More Memory Isn’t Easy
The End of Accounting as We Knew It
The Era of Superhuman Logistics Has Arrived: Building the First Autonomous Freight Network
Black Hat Asia 2026, April 23–24, Singapore
World Backup Day 2026: Why Recovery Has Become the Real Test of Cyber Resilience
Cyberhaven Launches Agentic AI Security as Shadow Agents Move Onto the Enterprise Endpoint
Palo Alto Networks Rewrites Security for the Agentic AI Era
RSAC Conference 2026, March 23–26, San Francisco
AI-Speed Warfare Comes to Cybersecurity: Booz Allen’s Vellox Suite Signals a Structural Shift
Cape Rebuilds the Mobile Carrier from Scratch, Raises $100M to Turn Privacy into Infrastructure
Semgrep Pushes Deeper Into AI-Native AppSec
Cloaked Bets Big on AI-Driven Privacy as $375 Million Raise Signals a Shift in Digital Power
Discern Security Pushes Cybersecurity Into the Agentic Era Ahead of RSA Conference 2026

Media Partners

  • Market Research Media
  • Technology Conferences
Netflix Price Hikes, The Economics of Dominance in a Saturated Streaming Market
America’s Brands Keep Winning Even as America Itself Slips
Kioxia’s Storage Gambit: Flash Steps Into the AI Memory Hierarchy
Mamdani Strangling New York
The Rise of Faceless Creators: Picsart Launches Persona and Storyline for AI Character-Driven Content
Apple TV Arrives on The Roku Channel, Expanding the Streaming Platform Wars
Why Attraction-Grabbing Stations Win at Tech Events
Why Nvidia Let Go of Arm, and Why It Matters Now
When the Market Wants a Story, Not Numbers: Rethinking AMD’s Q4 Selloff
BBC and the Gaza War: How Disproportionate Attention Reshapes Reality
Elevate 2026, April 22–24, 2026, Atlanta
WWDC 2026, June 8–12, Cupertino & Online
Zip Forward Europe 2026, April 16, 2026, London
AI Summit: Operationalizing Intelligence and Driving Innovation, April 16, 2026, Woburn, Massachusetts
GTC 2026, March 16–19, San Jose
Taiwan’s AI Ecosystem Steps Into the Spotlight at NVIDIA GTC, March 16–19, 2026
COMPUTEX 2026, June 2–5, Taipei
360° Mobility Mega Shows 2026, April 14–17, Taipei
Forrester CX Summit Series 2026: Amsterdam, New York, San Francisco
IAMPHENOM 2026, March 10–12, Pennsylvania Convention Center, Philadelphia

Copyright © 2022 Technologies.org

Media Partners: Market Analysis & Market Research and Exclusive Domains, Photography